Making a drama is creative work. Managing a team is operations work. Operations work runs on data.
Bollo’s team dashboard has just three metrics: credit spend, generation time, and generation attempts. That’s not many, but each one has a clear way to be read.

1. Where to Find It
Path: Avatar → Team Management → Team Members
Three query dimensions: date, team, member.
The combination you pick determines the question you can ask:
- Date only → overall trend. Is the team speeding up or stalling?
- Date + team → cost curve for a single project or squad
- Date + member → individual output and consumption
Click the metric tabs to see the matching trend chart and data.
2. What Each Metric Tells You
2.1 Credit Spend
It reflects: production cost and how much of your compute allowance is left.
Watch two things:
- Absolute volume: how much you burned this month
- Trend: whether any day spiked abnormally
A sudden spike usually maps to one of three situations: a batch re-run, a wrong parameter (high resolution with a long duration, by mistake), or someone trying a new model and drawing at random. All three are traceable and manageable.
2.2 Generation Time
It reflects: the net runtime of high-load rendering and compositing.
Note “net runtime” — queue time and manual operation are excluded. This is pure machine time.
The value of this metric is that it tells you your output ceiling. If generation time is already running close to 24 hours, compute is the bottleneck and you need more credits to scale. If generation time is low but delivery is slow, the bottleneck is people, not machines.
2.3 Generation Attempts
It reflects: AI generation frequency, and whether the pipeline is stable.
An “attempt” is one generation call. The number has two readings:
- High attempts, high finished output → the pipeline is running normally
- High attempts, low finished output → heavy rework, which points at bad prompts or bad assets
The second case is the one to worry about. Teams often think they are “working hard” when they are really failing on the same problem over and over.
3. Reading the Three Together
A single number proves nothing. Combinations carry the signal.
| Combination | Meaning | What to do |
|---|---|---|
| Credits ↑ attempts ↑ finished cuts ↑ | Healthy scaling | Keep going, watch your allowance |
| Credits ↑ attempts ↑ finished cuts → | Wasted attempts | Stop and check prompts and assets |
| Credits ↑ attempts → finished cuts → | Cost per attempt went up | Check whether resolution or duration was raised |
| Credits → attempts ↓ finished cuts → | Efficiency gain | Review what worked and lock it into the process |
| Generation time saturated | Compute bottleneck | Buy more credits or adjust the schedule |
4. By Member: Fairness or Efficiency
Member-level data has two uses, depending on what you need:
Use one: cost allocation. Who consumed how much compute — useful for finance settlement.
Use two: output assessment. Whoever has low attempts but high finished output has a good method worth turning into an SOP; whoever has high attempts but low output needs coaching.
But don’t stop at the leaderboard. People shooting VFX shots will always draw more than people shooting dialogue coverage. That’s not an efficiency gap, it’s a different job. Always read member data against the actual division of work.
5. By Date: Finding Cost Anomalies
The daily curve is the best tool for anomaly hunting.
A practical routine:
- Pull the last 30 days and find the three highest
- Cross-check those three days against the project schedule
- Open the project and check compute spend in the project overview
- Narrow it to asset generation or storyboard generation
- Check the parameter settings and prompts used at the time
Most cost anomalies trace back to one specific action, e.g. “that day we switched from 720p to 1080p and batch-ran 40 images.”
6. Three Management Habits
6.1 Reconcile Weekly
Spend ten minutes on Friday looking at the three metrics for the week. Far better than discovering you’re over budget at month end.
6.2 Build Your Own Baseline
Once things run smoothly, record what “one standard episode” costs in credits and in generation time.
With a baseline you can quote and schedule with evidence. It’s also why case data (credits per minute per show) lines up.
6.3 Let Data Point Back at Your Process
Data isn’t for performance review. It’s for finding holes in the process. Abnormally high attempts mean the upstream stage (script/assets) isn’t solid. Saturated generation time means the schedule has no slack.
7. Next Steps
For allowance allocation and account management, see Team Compute Allocation and Account Setup.